Piping Lead Engineer shall review Basic Engineering Package (BEP) from client for availability of following information for completion of piping design work.
General Project Information
- Project Description.
- Project Design Basis.
- Site Condition.
- List of Design codes and standards.
- Fire Protection philosophy and safety requirement.
- Project schedule.
- Project procedure if any.
- Client’s standards if any.
- List of statutory regulations applicable.
- Drainage Philosophy and Requirement.
Process Information
- Process Description
- Process and Utility Flow Diagram.
- Process and Utility P & I Diagram.
- Utility Distribution Diagram.
- Minimum Equipment elevation summary.
- Equipment Process Datasheet.
- Process Critical line List.
- Hazardous Area Classification drawing.
- Line List with process conditions.
Equipment Information
- Equipment Engineering Datasheet.
- Package equipment vendor scope of work and tie in list.
- Acceptable equipment external nozzle loads.
Piping Design Information
- Preliminary plot plan.
- Preliminary Equipment Layouts.
- Preliminary piping material specification or material selection criteria.
- Special design requirements if any.
- Piping Design Philosophy.
- Instrument Process Hook up requirement.
- Stress analysis/ Support design guidelines/ standards
- 3D design criteria.
Completeness of Documents/Drawings
Process and Utility PIDs
- Legend sheet with information on
- line numbering system,
- valve identification system,
- SM numbering,
- Instrument numbering,
- Process specific requirement.
- Instrument process hook up requirement etc.
- All lines are numbered.
- Line no. to contain, Size of pipe, Fluid code, Line sequence no., Piping material specification, Insulation/ Painting/ Heat tracing/ Jacketing requirement, Area no. if any as minimum.
- Valve and SM identification in the form of symbol or tag no.
- Instrument tag no.
- Equipment nozzle identification in terms of nozzle no. or tie in point no.
- Identification of proprietary package battery limit.
- Specific requirement such as slope, spool, specification break, line routing criteria, gravity drain, barometric leg requirement,
- Valve/ Instrument location criteria etc.
- Line continuation to other P & I D properly marked
- Applicable notes
- Minimum equipment elevation requirement
- Brief equipment specification
- Insulation requirement on equipment
- Process vents and drains
- Utility station requirements
Equipment Data Sheets Review
- Operating and design conditions.
- Dimensional data.
- Support type.
- All major nozzles located and elevation/ projection defined
- Maintenance requirement if any.
- Insulation thickness provided
Other Design Documents Review
- Piping Design Philosophy.
- Project Design Basis.
- Stress and Support Design Philosophy.
- 3D Design Philosophy.
- Availibility of Data in Line List
Preliminary Plot Plan Review
- Functional and Process Point of view.
- Man and Material movement point of view.
- Local statutory requirement point of view.
- Space management point of view for better utilisation of space.
- Hazard point of view – Hazardous area, Emission, Venting, Flaring etc.
Preliminary Equipment Layout Review
Check provided preliminary Equipment Layouts from :
- Functional and Process Point of view.
- Man and Material movement point of view.
- Local statutory requirement point of view.
- Space management point of view for better utilisation of space.
- Hazard point of view – Hazardous area, Emission, Venting, Flaring etc.
- Access, Operation and Maintenance point of view.
- Hazardous area classification
- Safety